Design Water System

Note: In Pipeline/Cable Noc cases, Applicant to apply separately for all crossing. In case multiple crossing in a single application, the same would be rejected and fees deposited will be forfeited.


Applicant Details


Entity Details

For Bridge GAD, kindly apply after obtaining NOC from Chief Engineer Canal or Chief Engineer Drainage.



Canal Details

Enter Geo-Coordinate of Site (Where Work is to be Executed)

Maximum 2 number of bridges per Gad will be entertained, Only one GAD per application will be entertained here.

If less processing fees submitted than required. Then application will be rejected and amount will not be refunded.



1) Checklist for GAD of Bridge
View
2) Checklist for Pipeline or Cable Case
View

Note: Before applying for GAD, kindly ensure to obtain the NOC from chief Engineer Canals/Drainage




Important Information

1) In “Hydraulic vetting of GAD across canal/river/drain” or “Laying of pipeline/Cable” case , the time limit for submitting the final drawing and required documents(if any) to Assistant Design Engineer on WRD portal is 30 days. If applicant fails to submit GAD and document in this time limit, the case will be closed and processing fees will not be refunded.

2) In “Laying of pipeline/cable” case, the time limit for the final payment is 30 days. If applicant fails to make payment in 30 days, the case will be closed and processing fees will not be refunded.

For Payment Please login your account using Email Id and Password.